Training Completed to Date:
Steam Power Plant Operations
- 12 trainees
- 40 instructional hours
Kiln Processing Fundamentals for Lafarge North America Alpena Plant 4/5
– 4/9 2004
- 17 trainees
- 16 instructional hours
Training Objectives:
- Combustion
- Coal Mill Operation
- Heat Transfer
- Rings and Build Ups
- Cooler Operation
- Clinker Mineralogy
SolidWorks 3-D CAD (Computer Aided Design)
- 38 trainees
- Five
sections/40 hours per section 200 instructional hours
Feature CAM (Computer Aided Manufacturing)
- 10 trainees
- 80
instructional hours
Microsoft Outlook for 2003
- 7 trainees
- 4 instructional hours
Microsoft Certified System Engineer
- Microsoft 2273
Managing &
Maintaining a Microsoft Windows Server 2003 Environment
- 17 trainees
- 40
instructional hours
- Microsoft 2277
Implementing, Managing, and Maintaining a Microsoft
Windows Server
- 19 trainees
- 40 instructional hours
- Microsoft 2278
Planning and Maintaining a Microsoft Windows Server
2003 Network Infrastructure
- 16 trainees
- 40 instructional hours
Plant Integration for Concrete Masonry Production
- 12 trainees
- 160
instructional hours
Utility Tech I
- 8 trainees
- 36 instructional hours
TOTAL INSTRUCTIONAL HOURS WERE 656
TOTAL TRAINEES 149
Trainee Highlights:
85 percent of trainees rated the training excellent.
Student comments:
“Great information. Very useful course. A lot of practical
information.”
“Very well done. Gained a lot of knowledge on various aspects of
kiln operation.”
“Instructor was very knowledgeable.”
Excellent information presented. Helps to understand inner workings
of the process and how it affects maintenance, production, etc.”
Trainee Profile Highlights:
75 percent of trainees had either a 2-year technical degree, a
Bachelor’s degree, or a Master’s degree.
|